
Every weekend, people arrive carrying different stories, and week after week, God meets them here. Lives are being changed, families restored, students discipled, and faith awakened. That growth is a gift, and it has also brought us to a moment of decision.
Our rooms are filling. Kids and student spaces reach capacity. Services overflow. What might look like a limitation is actually a sign of life. God is bringing people, and He is inviting us to prepare for who He will send next.
The LEGACY Campaign is not about pressure, comparison, or obligation. It is a prayerful response to God’s movement among us. A shared step of faith to create space for more stories, more discipleship, and more generations to encounter Jesus.
At CyLife, everything we do flows from one mission: to make and send disciples who love and live like Jesus. LEGACY is about building today with that mission in mind, so future generations can continue to grow, belong, and be transformed.
We invite you to pray with us and ask a simple question:
“Lord, how would You have us participate?”



Want to learn more about Legacy? Take a moment to explore our Legacy booklet and watch Pastor Bob’s Legacy sermon series to hear the heart and vision behind this journey.
Last Week
• RL Site Worx returned to the site and wrapped up with the underground
utilities near the Tuckerton side of the property
• American Fence came out to the site to remove partial of the construction
fence located on the site
• Texas Out House was onsite to remove temp toilets and will deliver more
units once Construction Documents are approved to continue with lime mix
stabilization and paving
This Week
• Forner Electric is on stand by on erecting Sports Field light poles and waiting
on direction on easement approval
• American Fence is also on standby and waiting on easement approval for
fence and gate installation
• RL Site Worx will return to the site for the Hydro Static test once the Fire
Line drawings are approved and we are able to move forward with
construction
• RL Site Worx needs to complete Hydro Static testing, lime mix stabilization
and paving
• AGE Concrete will return to the site once lime mix stabilization is complete
